您好,欢迎访问济南爱窗加工部 的网站!
客户服务热线:13296405222

地址:济南市天桥区天桥东街后陈家楼31号

联系我们
济南爱窗加工部

联系人:孟经理

联系电话:13296405222

网址:http://www.jnyuqilin.com

地址:济南市天桥区天桥东街后陈家楼31号

防火卷帘门规范你知道有哪些?

来源:http://www.jnyuqilin.com/  发布时间:2019-12-27 11:45:26

电动卷帘门现如今采用的都是十分普遍,许多仓库厂房出入机动车辆的正门,各类很多住宅楼的汽车车库还是会采用电动卷帘门。因为其造型设计整洁、功能完善、操控便捷、停机时也可手动式实际操作,因此被大批量应用。电动卷帘门主要包括由端板、卷轴、卷帘门电机、传动链条、滑轨、卷门帘片、电控箱等构件构成。
 
Nowadays, the electric rolling shutter doors are widely used. Many warehouses and workshops access the main doors of motor vehicles, and many kinds of car garages in residential buildings still use electric rolling shutter doors. Because of its neat design, perfect function, convenient operation, and manual operation during shutdown, it is widely used. The electric rolling shutter door mainly consists of end plate, roller, rolling shutter motor, transmission chain, slide rail, rolling shutter sheet, electric control box and other components.
 
防火卷帘门是一种适用于建筑物较大洞口处的防火、隔热设施,产品在设计安装上起到了一定的作用技术。防火卷帘门广泛应用于工业与民用建筑的防火隔断区,能有效地阻止火势蔓延,保障生命财产,是现代建筑中不可缺少的防火设施。
 
Fireproof rolling shutter door is a kind of fire prevention and heat insulation facilities suitable for large openings of buildings. The product plays a certain role in the design and installation. Fire shutter door is widely used in industrial and civil building fire partition area, can effectively prevent the spread of fire, protect the safety of life and property, is an indispensable fire prevention facilities in modern buildings.
 
9.jpg
 
从受火作用起到背火面热辐射强度超过临界热辐射强度规定值时止,或帘板面窜火时止。这段时间称为耐火极限,用以决定钢防火卷帘的耐火性能等级。
 
From the action of fire to the time when the heat radiation intensity of the back fire surface exceeds the specified value of the critical heat radiation intensity, or when the curtain plate surface is on fire. This period of time is called fire resistance limit, which is used to determine the fire resistance grade of steel fire shutter.
 
帘板、座板、导轨、门楣、箱体应采用镀锌钢板和钢带,以及普通碳素结构钢。卷轴用碳素结构钢或普通碳素结构钢,以及电焊钢管或无缝钢钢管。支座应用普通碳素结构钢或灰口铸铁。帘板厚1.2~2.0mm、掩埋型导轨厚1.5~2.5mm、外露型钢板导轨厚度≥3.0mm,帘板嵌入导轨的深度应符合下表要求。
 
The curtain plate, seat plate, guide rail, lintel and box body shall be made of galvanized steel plate and strip, as well as ordinary carbon structural steel. High quality carbon structural steel or ordinary carbon structural steel, electric welded steel pipe or seamless steel pipe are used for reels. The bearing shall be made of ordinary carbon structural steel or gray cast iron. The thickness of the curtain plate is 1.2-2.0 mm, the thickness of the buried guide rail is 1.5-2.5 mm, and the thickness of the exposed steel plate guide rail is ≥ 3.0 mm. The depth of the curtain plate embedded in the guide rail shall meet the requirements in the table below.
 
安装要求:钢防火卷帘安装在建筑物墙体上,应与墙内埋件焊接或预埋螺栓连接,也可用膨胀螺栓安装,但其锚固强度必须满足要求。
 
Installation requirements: when the steel fire shutter is installed on the building wall, it should be welded with the embedded parts in the wall or connected with the embedded bolts. It can also be installed with expansion bolts, but its anchoring strength must meet the requirements.
 
在操作使用过程中,操作人员不得擅自离开操作地点。应密切注意启闭情况和执行情况,在启闭时卷帘下面不准有人站立、走动。以防止行程开关失灵,卷帘卡死,电机受阻和发生其它事故。 防火分区和防火隔断的钢质防火卷帘平时不作频繁使用,一旦区域发生火情。卷帘应有效地投入使用,带有联动控制、自动控制防火卷帘务必根据一套控制指令程序进行。
 
In the process of operation, the operator shall not leave the operation site without authorization. Close attention should be paid to the opening and closing situation and the implementation. No one is allowed to stand or walk under the rolling shutter when opening and closing. In order to prevent travel switch failure, roller shutter stuck, motor blocked and other accidents. Fire compartment and fire partition of steel fire shutter usually do not make frequent use, once the area of fire. The rolling shutter should be put into use effectively, with linkage control and automatic control. The rolling shutter must be carried out according to a set of control instruction program.
 
今天的精彩内容由济南电动卷帘门安装维修提供,真诚为您提供满意的服务,如果您有疑问或者是问题请欢迎来电咨询,或者是进入我们的网址:http://www.jnyuqilin.com
 
Today's wonderful content is provided by the installation and maintenance of Jinan electric roller shutter door. We sincerely provide you with satisfactory service. If you have any questions or questions, please call us or enter our website: http://www.jnyuqilin.com
 
电动卷帘门安装中关键步骤介绍
电机是整道电动卷帘门的中心地址,也是整道电动卷帘门的大脑,控制着整道电动卷帘门的存亡,所以电机设备及限位调试在全部电动卷帘门设备程序中关重要。假设电机发作缺陷需要替换时,这个修补也要非常留神。下面济南电动卷帘门安装维修小编就和大家介绍一下电动卷帘门的一些常识。
 
The motor is the central address of the whole electric rolling door, and it is also the brain of the whole electric rolling door. It controls the survival of the whole electric rolling door, so the motor equipment and limit debugging are very important in all the electric rolling door equipment programs. If the motor needs to be replaced, the repair should also be very careful. The following Jinan electric roller shutter door installation and maintenance of small series and you introduce some common sense of electric roller shutter door.
 
电动卷帘门的电机与卷筒芯轴之间是由传动链条来联接,电机地脚用螺钉固定在链轮支架板上。设备或替换电机前,必须将卷帘门降端或用支架将卷帘门撑住。这是由于一是卷帘门的制动是靠电机本体上的制动器来起效果,电机吊销后,卷帘门则没有制动而主动下滑;二是可以使传动链条放松,便当将链条取下。
 
The motor of the electric rolling shutter door is connected with the mandrel of the drum by a transmission chain, and the motor anchor is fixed on the sprocket support plate with screws. Before replacing the equipment or motor, the rolling shutter door must be lowered to the lowest end or supported by a bracket. This is due to the following reasons: first, the brake of the rolling shutter door depends on the brake on the motor body; after the motor is cancelled, the rolling shutter door does not brake and slides down actively; second, the transmission chain can be relaxed so that the chain can be removed easily.
 
济南电动卷帘门安装维修
 
Installation and maintenance of Jinan electric rolling shutter door
 
替换电机的进程:将电机接线做好符号然后吊销,将电机地脚螺丝拧松将传动链条摘下,毕竟将电机地脚螺丝吊销将电机取出;新电机设备次序相反,但要留神,电机设备好后,其本体上的环形手拉链条应天然笔直向下,不得有卡阻表象。
 
The process of replacing the motor: mark the motor wiring and then cancel it, loosen the motor anchor screw and take off the drive chain. After all, cancel the motor anchor screw and take out the motor; the order of new motor equipment is opposite, but pay attention to it. After the motor equipment is finished, the circular hand zipper bar on the body should be natural and straight down, and there should be no jamming appearance.
 
电机替换结束后,检查线路、机械组织均无疑问,卷帘门下方无障碍物,门下禁止通行,招认后初步试车调试限位。卷帘门的限位组织是设备在电机外壳上,称为限位螺套滑块式。试机前应先松开限位组织上的锁紧螺钉,然后用手拉动环形链条使门帘离地上1米分配,先试“上”、“停”、“下”按键,调查卷门升、停、降各功用是不是活络牢靠,若正常即可将门帘上升或下降到判定的方位,然后旋转限位螺套,调整碰微动开关滚轮,听到“滴答”声后,拧紧锁紧螺钉。重复调试,使限位抵达方位时,再将锁紧螺钉用力旋紧即可。
 
After the replacement of the motor, check the circuit and mechanical organization. There are no obstacles under the rolling shutter door. No traffic is allowed under the door. After admitting, test run and adjust the limit. The limiting organization of rolling shutter door is the device on the motor shell, which is called limiting screw sleeve sliding block type. Before the machine test, loosen the locking screw on the limit organization, and then pull the circular chain by hand to distribute the curtain 1 meter above the ground. First, try the "up", "stop" and "down" buttons to investigate whether the functions of the door lifting, stopping and lowering are flexible and reliable. If normal, the curtain can be raised or lowered to the determined position, and then rotate the limit screw sleeve to adjust the touch to the microswitch roller to hear the noise After the "tick" sound, tighten the locking screw. Repeat the debugging to make the limit reach the best position, and then tighten the locking screw.
 
电动卷帘门在工序被很多选用,所以多点了解电动卷帘门的工业知识都是一件好事,也便当往常的运用。
 
Electric roller shutter door in the process is a lot of choice, so more understanding of the industrial knowledge of electric roller shutter door is a good thing, also easy to use as usual.
 
济南电动卷帘门安装维修
 
Installation and maintenance of Jinan electric rolling shutter door
 
电动卷帘门的安装方法(a)预留¢32mm PVC管道,从控制盒的位置下端往下地平面以下,穿墙往外,轨道大致位置地平面下0.1-0.15米处,供以后伸缩门室外线路入室。
 
Installation method of electric rolling shutter door (a) reserve ¢ 32mm PVC pipe, from the lower end of the control box to below the ground level, through the wall to the outside, to the approximate position of the track, 0.1-0.15m below the ground level, for the outdoor line of the expansion door to enter the room.
 
(b)安装伸缩门,接好线路,调试开关控制盒。
 
(b) Install the telescopic door, connect the line, and debug the switch control box.
 
(c)按照上表得出门洞长度,砌门洞时洞宽内净空不小于0.75-0.8米,高度内净尺寸普通门不小于门高+0.25米,豪华门不小于门高+0.1米;门洞末端里侧中上端留宽0.4米,高0.6米检修孔,有条件的可将门洞总长度再加长0.2-0.3米,这样可将检修孔改成一扇小门,方便日后检修维护伸缩门电气线路;
 
(c) According to the above table, when building the door opening, the inner clearance of the opening shall not be less than 0.75-0.8m, the inner clearance of the height shall not be less than + 0.25m for ordinary doors and + 0.1M for luxury doors; the middle and upper end of the inner side of the end of the door opening shall be provided with a manhole with a width of 0.4m and a height of 0.6m. If possible, the total length of the door opening can be further extended by 0.2-0.3m, so that the manhole can be changed into a small door, It is convenient to repair and maintain the electrical circuit of the telescopic door in the future;
 
(d)将220V电源引到控制盒的位置下端,要求是再带1根接地线,粗细规格为1.37,而且有漏电保护装置,并采用PVC暗敷;
 
(d) To lead the 220 V power supply to the lower end of the control box, it is better to bring another grounding wire, with the thickness of 1.37, leakage protection device and PVC concealed laying;
 
(e)确定传达室内控制盒的位置,即操纵伸缩门开关的装置位置;
 
(e) Determine the position of the indoor control box, that is, the position of the device to operate the telescopic door switch;
 
(f)在铺设轨道前除留下约0.8-0.9米宽外,先做好两边的地面;2-3日(冬天5-7日)后,再在铺设轨道的同时,土建配合做好轨道处的地面,注意铺设轨道期间,路面禁止通行,以免压弯轨道;
 
(f) Before laying the track, in addition to leaving a width of about 0.8-0.9 meters, the ground on both sides should be prepared first; after 2-3 days (5-7 days in winter), while laying the track, the civil engineering should cooperate with the ground at the track. During laying the track, the road should not be allowed to pass, so as to avoid bending the track;
 
如果您对济南电动卷帘门安装维修还有哪些不懂的问题,是可以直接咨询以下的网址:http://www.jnyuqilin.com
 
If you have any questions about the installation and maintenance of Jinan electric rolling shutter door, you can directly consult the following website: http://www.jnyuqilin.com
 
防火门的安装应该注意哪些标准?
 
 
1、钢质隔热防火门装置对应在结构质量经过检验合格后进行。
 
1. The installation of steel thermal insulation fire door shall be carried out after the structural quality has passed the inspection.
 
2、按图纸尺度弹好门窗中心线,并弹好室内+50cm标准水平线,核对门洞口尺度及标高是否契合规划要求,如发现问题,有必要提早处理。
 
2. Snap the center line of doors and windows according to the drawing scale, and snap the indoor + 50cm standard horizontal line, check whether the door opening scale and elevation meet the planning requirements, if any problem is found, it is necessary to deal with it in advance.
 
3、查看口两边的预埋木砖、预留空泛,其位置应契合要求,发现问题,要提早处理好。
 
3. Check the embedded wood bricks and reserved voids on both sides of the opening, and their positions should meet the requirements. If problems are found, they should be handled well in advance.
 
4、钢质隔热防火门装置有必要选用预留洞口的办法,不得选用边装置砌口或许先装置后砌口的办法。
 
4. It is necessary to select the method of reserving openings for the installation of steel thermal insulation fire door. It is not allowed to select the method of edge installation or installation first and then installation.
 
5、依据图纸要求,查看门窗的种类、标准、敞开方向及组合件、附件,并对其外形尺度及平整度查看校正,合格后方可装置。
 
5. According to the requirements of the drawing, check the type, standard, opening direction, assembly and accessories of doors and windows, and check and correct the external dimension and flatness. The installation can be started only after it is qualified.
 
资料、东西质量要求
 
4.jpg
 
Quality requirements of materials and materials
 
1、钢质隔热防火门的标准、型号应契合规划要求。
 
1. The standard and model of steel thermal insulation fire door should meet the planning requirements.
 
2、钢质隔热防火门资料要具有产品的出厂合格证及质量确保书。
 
2. The data of steel thermal insulation fireproof door shall have the factory certificate and quality assurance certificate of the product.
 
3、钢质隔热防火门要由有资质的加工厂加工。
 
3. Steel heat insulation fire door should be processed by qualified professional processing plant.
 
4、计量东西应是经法定检验合格的产品。
 
4. The products to be measured shall be the products that have passed the statutory inspection.
 
5、施工东西运用前应进行性和适用性查看。
 
5. Check the safety and applicability before using the construction equipment.
 
6、操作之前,先准备好机具,所用机具应完全、适用、无障碍,以确保施工质量和出产顺利进行。
 
6. Before operation, machines and tools should be prepared. All machines and tools should be complete, applicable and barrier free to ensure the construction quality and smooth production.
 
7、操作之后,清点收拾机具,妥善保管,以便再用。
 
7. After operation, check and tidy up the machines and tools, and keep them properly for reuse.
 
有了济南防火卷帘门安装维修上面的小总结,希望对广大客户有所帮助,如果有什么不理解的或者寻求帮助的请点击我们的网站:http://www.jnyuqilin.com   或者来电咨询,我们会尽全力为您
 
With the summary of the installation and maintenance of Jinan fire shutter door, we hope to help our customers. If you have any questions that you don't understand or ask for help, please click our website: http://www.jnyuqilin.com   Or call consultation, we will try our best to solve for you