防火卷帘门安装维修后需及时进行功能测试
1、通电功能测试:将防火定州祈诺卷帘控制器分别与消防控制室的火灾报警控制器或消防联动控制设备、相关的火灾探测器、卷门机等连接并通电,防火卷帘控制器应处于正常工作状态;
1. Power on function test: connect and power on the fire prevention Dingzhou Qinuo roller shutter controller with the fire alarm controller or fire linkage control equipment in the fire control room, relevant fire detectors, door rolling machine, etc., and the fire prevention roller shutter controller should be in normal working state;
2、备用电源测试:设有备用电源的防火卷帘,其控制器应有主、备电源转换功能。备用电源的电池容量应保证防火卷帘控制器在备用电源供电条件下能正常可靠工作1h,并应提供控制器控制卷门机速放控制装置完成卷帘自重垂降,控制卷帘降至下限位所需的电源;
2. Test of standby power supply: the controller of the fire shutter with standby power supply shall have the function of switching between main and standby power supply. The battery capacity of the standby power supply shall ensure that the fire shutter controller can work normally and reliably for 1H under the power supply condition of the standby power supply, and the power supply required for the controller to control the quick release control device of the door rolling machine to complete the self weight sag of the shutter and control the shutter to the lower limit shall be provided;
3、火灾报警功能测试:防火卷帘控制器应直接或间接的接收来自火灾探测器组发出的火灾报警信号,并应发出声、光报警信号;
3. Fire alarm function test: the fire shutter controller shall directly or indirectly receive the fire alarm signal from the fire detector group, and shall send audible and visual alarm signals;
4、故障报警功能测试:防火卷帘控制器的电源缺相或相序有误,以及防火卷帘控制器与火灾探测器之间的连接线断线或发生故障,防火卷帘控制器均应发出故障报警信号;
4. Fault alarm function test: if the power supply of the fire shutter controller is out of phase or the phase sequence is wrong, and the connecting wire between the fire shutter controller and the fire detector is broken or malfunctioned, the fire shutter controller shall send out fault alarm signals;
5、自动控制功能调试:自动控制功能调试时,当防火卷帘控制器接收到火灾报警信号后,应输出控制防火卷帘完成相应动作的信号,并应符合下列要求:
5. Automatic control function debugging: when the automatic control function debugging, when the fire shutter controller receives the fire alarm signal, it should output the signal to control the fire shutter to complete the corresponding action, and should meet the following requirements:
1)控制分隔防火分区的防火卷帘由上限位自动关闭至全闭;
1) Control the fire shutter separating the fire compartment to close automatically from the upper limit to the full close;
2)防火卷帘控制器接到感烟火灾探测器的报警信号后,控制防火卷帘自动关闭至中位(1.8m)处停止,接到感温火灾探测器的报警信号后,继续关闭至全闭;
2) After receiving the alarm signal from the smoke fire detector, the fire shutter controller controls the fire shutter to automatically close to the middle position (1.8m) and stop. After receiving the alarm signal from the temperature fire detector, it continues to close to the full close;
3)防火卷帘半降、全降的动作状态信号应反馈到消防控制室
3) The action status signals of half lowering and full lowering of the fire shutter shall be fed back to the fire control room
6、手动控制功能测试:手动控制功能调试时,手动操作防火卷帘控制器上的按钮和手动按钮盒上的按钮,可控制防火卷帘的上升、下降、停止;
6. Manual control function test: during manual control function commissioning, manually operate the button on the fire shutter controller and the button on the manual button box to control the rise, fall and stop of the fire shutter;
7、自重下降功能测试:自重下降功能调试时,应将
济南防火卷帘门安装维修机电源设置于故障状态,防火卷帘应在防火卷帘控制器的控制下,依靠自重下降至全闭。
7. Self weight lowering function test: during the self weight lowering function commissioning, the power supply of Jinan fire shutter door installation and maintenance machine should be set in the fault state, and the fire shutter should fall to fully closed by self weight under the control of the fire shutter controller.