您好,欢迎访问济南爱窗加工部 的网站!
客户服务热线:13296405222

地址:济南市天桥区天桥东街后陈家楼31号

联系我们
济南爱窗加工部

联系人:孟经理

联系电话:13296405222

网址:http://www.jnyuqilin.com

地址:济南市天桥区天桥东街后陈家楼31号

当前位置: 首页 > 新闻资讯 > 行业新闻

电动卷帘门没电怎么开?

来源:http://www.jnyuqilin.com/  发布时间:2021-05-13 18:22:17

一、电动卷帘门没电怎么开?
1、 How to open the electric rolling shutter door without electricity?
1、停电时门开着的,去拉电机上的一条链子,费一点时间就可以关上门。但是人就会被关在室内。
1. When the power is off, the door is open. Go and pull a chain on the motor. It takes a little time to close the door. But people will be locked in.
2、停电时门关着的,人又在室内,去拉电机上的一条链子,费一点时间就可以打开门。
2. When the power is off, the door is closed, and the person is in the room. Go to pull a chain on the motor, and it takes a little time to open the door.
3、停电时门关着的,人又在室外,只有等到来电才。 在进行卷帘门安装的时候,可以安装不间断的电源比如后备电源,这样遇到停电时就不用担心了。
3. When the power is off, the door is closed, and the person is outside. It can only be solved when the power is on. When installing the rolling shutter door, you can install uninterruptible power supply, such as backup power supply, so that you don't have to worry about power failure.
            济南电动卷帘门安装维修
二、电动卷帘门怎么安装?
2、 How to install the electric rolling shutter door?
1、经校正合格后。表明尺寸大小,然后找工作人员设计出合适的电动卷帘门。用水泥砂浆或强度不低于10MPa细石混凝土嵌塞牢固即可。注意,这里值得注意的一点是框内高度比门扇的高度要一点点。一定要保证电动卷帘门与墙体结成整体,固定木楔。
1. After the correction, it is qualified. Show the size, and then find the staff to design a suitable electric roller shutter door. Cement mortar or fine aggregate concrete with strength not less than 10MPa can be used to firmly plug. Notice that the height inside the frame is a little higher than that of the door leaf. We must ensure that the electric shutter door and the wall form a whole, fixed wedge.
2、先在需要安装的门框框口位置画出线,门缝应均匀平整、先把电动卷帘门的门框固定,不得有过紧。
2. First, draw the outlet line at the door frame opening to be installed, and the door seam shall be even and flat. First, fix the door frame of the electric rolling shutter door without over tightening.
3、洞口两侧地面要预留凹槽,再粉刷洞口及墙体,这里要先拆掉门框下部的固定板。
3. Groove should be reserved on both sides of the hole, and then the hole and wall should be painted. Here, the fixed plate at the lower part of the door frame should be removed first.
4、封闭性要做好,开启电动卷帘门应该自由轻便,门框铁脚与预埋铁板件焊牢。粉刷完毕后、安装电动卷帘门扇主体门扇一、过松和反弹现象。
4. The sealing should be done well, the opening of the electric rolling shutter door should be free and light, and the iron foot of the door frame and the embedded iron plate should be welded firmly. After finishing painting, install the main door leaf of electric rolling shutter. First, the door leaf is too loose and rebounds.
感谢您的阅读,希望以上内容对您有所帮助,如您想了解更多精彩内容请点击我们的官网:济南电动卷帘门安装维修http://www.jnyuqilin.com
Thank you for reading, I hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: Jinan electric roller shutter door installation and maintenance http://www.jnyuqilin.com .